Investment map

Infrastructure Projects

Modernization of hydraulic turbines stage No. 1-21, 24

Type of works:

Modernization

Custumer:

PJSC "RusHydro" Branch "Saratov HPP"

Total volume of investments:

63 400 000,00 тыс. руб.

incl.extrabudgetary:

63 400 000,00 тыс. руб.

Location of the object:

Balakovo municipal district of the region

Term of realization:

2011-2028

Degree of readiness:

Construction and installation work is being carried out on gas turbines: station No. 1, station No. 5, station No. 9

Reconstruction of 40 boiler houses with installation of cabinet-type boilers, transfer of loads from 8 boiler houses to the network of Saratov CHPP-5, construction of a hot water boiler, KVGM-140-150 at Saratov CHPP-2

Type of works:

Reconstruction

Custumer:

Branch "Saratov" PJSC "T Plus"

Total volume of investments:

572 000,00 тыс. руб.

incl.extrabudgetary:

572 000,00 тыс. руб.

Location of the object:

Saratov

Term of realization:

2019-2020

Investment program of TK TURA LLC in the field of heat supply

Type of works:

2020-2023

Total volume of investments:

146 600,00 тыс. руб.

incl.extrabudgetary:

146 600,00 тыс. руб.

Location of the object:

Engelssky municipal district

Technical re-equipment of sections of the main heating network

Type of works:

Technical re-equipment

Custumer:

Branch "Saratov" PJSC "T Plus"

Total volume of investments:

4 300 000,00 тыс. руб.

Location of the object:

Municipal entity "City of Saratov", Balakovo municipal district, Engels municipal district

Term of realization:

2019-2024

Degree of readiness:

Work in progress