Investment map

Modernization and reconstruction of the Saratov Hydroelectric Station

Модернизация и реконструкция Саратовской ГЭС
  • Investments

    5962,1 million rubles

  • Investor

    PJSC RusHydro Branch – Saratov hydroelectric station

  • Number of workplaces

  • Project time frame

    05/01/2005 - 12/18/2016

Modernization and reconstruction of the Saratov Hydroelectric Station

PJSC RusHydro Branch – Saratov Hydroelectric Station realized 4 investment projects on modernization and reconstruction over past few years (Balakovsky Municipal District). 

The total volume of investments – 5962,1 million rubles.

Projects of PJSC RusHydro Branch – Saratov Hydroelectric Station:

1) Replacement of horizontally capsular hydrounits #22, #23. 
Realization: 2005-2014.
Investment – 2736,9 million rubles.

2) Reconstruction of power units 1T-5T with replacement of block transformers.
Realization: 2006-2014.
Investment – 1937,9 million rubles.

3) Reconstruction of concrete designs of running level zone.
Realization: 2006-2016. 
Investment – 489,6 million rubles.
The purpose is safety of the Hydraulic Engineering Construction and increasing energy preparedness. 

4) Modernization of VGS-1525/135-120 hydrogenerators #4, #7, #8.
Realization: 2011-2016. 
Investment – 797,7 million rubles.
The purpose is to increase capacity of hydrounits and the output, increasing energy preparedness.
Start of the equipment – May, 2016.

Saratov Hydroelectric Station is located on the border of the Middle and Lower Volga, 1129 km above the mouth of the Volga River, near the city of Balakovo, on the left-bank floodplain. It is the seventh stage of the Volga-Kama cascade of hydroelectric power stations and is one of the ten largest hydroelectric stations in Russia.

The generation of electricity depends on many factors, for example on the water content of the year. In the average water year, the Saratov Hydroelectric Station produces about 5.4 billion kWh of electricity. In total, from the beginning of first units operation more than 267 billion kWh of electricity were produced.

Hydroelectric power station building is combined with spillway discharge galleries. Also it's divided by temperature-sedimentary length seams into 24 sections. Two of them are coastal sections of closed installation sites (each 73 metres long and 72 metres wide) and 22 aggregate sections with a width of 45 metres and a length of 69 metres (in twenty-one – one vertical unit, twenty-two - two horizontal capsules unit).

The total length of the building is 1108 metres, height – 42,96 metres, including the height of foundation plate in its highest part – 7 meters. There are also open mounting sites with subsidiary auxiliary buildings, retaining mating walls and crane platforms connected to the building of the hydroelectric power station from the side of the right and left banks.

There are two pressure spillways in each aggregate section, in the sections of the mounting platforms – seven spillways. The underwater part of the Hydroelectric power station buildinghas three tiers.

Similar stories
card-img

Investments: 557 млн рублей
Инвестор: Investor: ООО «Петровские хлеба»
Number of workplaces: 45
Project time frame: 01/01/2021 - 01/01/2024
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 1 млрд рублей
Инвестор: Investor: ОП АО «БТК Групп»
Number of workplaces: 2500
Project time frame: 01/01/2023 - 01/01/2024
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 1,1 млрд рублей
Инвестор: Investor: ООО «Интэк»
Number of workplaces:
Project time frame: 01/01/2022 - 01/01/2024
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 1,4 млрд рублей
Инвестор: Investor: ООО «Метеор Термотехника Энгельс»
Number of workplaces: 191
Project time frame: 01/01/2013 - 01/01/2024
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 1,9 млрд рублей
Инвестор: Investor: АО «Металлургический завод Балаково»
Number of workplaces: 36
Project time frame: 01/01/2021 - 01/01/2024
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 2 млрд рублей
Инвестор: Investor: ООО «Грачевка»
Number of workplaces: 100
Project time frame: 01/01/2022 - 01/01/2024
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 4,8 млрд руб
Инвестор: Investor: АО «Апатит»
Number of workplaces: 28
Project time frame: 01/01/2020 - 01/01/2024
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 2,6 млрд рублей
Инвестор: Investor: АО «ЕПК Саратов»
Number of workplaces: 200
Project time frame: 01/01/2019 - 01/01/2025
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 2 млрд рублей
Инвестор: Investor: АО «Металлургический завод Балаково»
Number of workplaces: 68
Project time frame: 01/01/2021 - 01/01/2025
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 2 млрд рублей
Инвестор: Investor: ООО «А-сервис»
Number of workplaces: 692
Project time frame: 01/01/2023 - 01/01/2025
08/18/2025 11:00:00 pm More detailed