Investment map

Creation the system of processing and utilization municipal solid waste

Создание системы переработки и утилизации ТКО5
  • Investments

    1444,8 million rubles

  • Investor

    JSC “Waste Management”

  • Number of workplaces

  • Project time frame

    03/26/2013 - 12/20/2017

Creation the system of processing and utilization municipal solid waste

JSC "Waste management" has implemented 2 investment projects to develop a processing and recycling system for municipal solid waste.

Total investments amounted to 1444,8 million rubles.

Projects of the JSC "Waste management":

1) Concession agreement (municipal level) for the reconstruction of the municipal solid waste site.
Implementation period: 2013-2015.
Investment: 346,8 million rubles.
Number of workplaces: 18.
In the territory of the Balakovsky municipal district.

2) Concession agreement (municipal level) for the reconstruction of the municipal solid waste site.
Implementation period: 2013-2015.
Investment: 1098 million rubles.
Number of workplaces: 201.
In the 12 municipal districts of the region: Engelssky, Ershovsky, Novouzensky, Alexandrovo-Gaysky, Dergachevsky, Ozinsky, Fedorovsky, Sovetsky, Pitersky, Krasnokutsky, Marksovsky and Rovensky districts.

The opening of the Engelssky complex took place on March 18, 2015.

JSC "Waste Management" operates Engelssky Intermunicipal Polygon according to the concession agreement with the Saratov Region Government. The affiliate has signed contracts for the processing and disposal of wastes at the Engelssky Recycling Complex with 93 enterprises in the Saratov Region.

On average, more than 50 garbage trucks of different capacity with solid municipal and large wastes are arriving at the Engelssky Recycling Complex every day. After sorting, processing and shredding on specialized equipment, less than 40% of the total waste is sent to the maps of the Intermunicipal Polygon municipal solid waste, which is subject to additional packing at the polygon.

In terms of the sort amount, incoming municipal solid waste sorted about 40% of the secondary material resources. Besides, all the wood incoming to the Engelssky Intermunicipal Polygon remains to be recycled for the production of biocompost and heating of premises (about 5%). Also, after shredding, the volume of large waste is reduced. 60 per cent of the waste generated by the production area is reduced As a result of the work.

Agency for Strategic Initiatives recommends this project as one of the best social and economic practices in the housing and public utilities in Russia.

The project is aimed at:

  • Environmentally safe location of municipal solid waste.
  • Improving sanitary and environmental conditions for settlements in the region.
  • Increasing the number of wastes returned for secondary use. 
  • Reducing the morbidity of the population.
Two high-tech waste transfer stations at closed Guselsky and Elshansky polygons in Saratov are being opened in the near future, wastes from Volsky and Khvalinskyi municipal districts are already being transported to a civilized burial site at Balakovsky Intermunicipal Polygon.

All the projects of the JSC “Waste Management” in the region have almost gone through the construction stage and are moving into the operational phase. The Engelssky recycling complex and 11 Recycling Complexes have been in operation for more than two years, and the Saratov Recycling Complexes will become operational in the near future.

Similar stories
card-img

Investments: 557 млн рублей
Инвестор: Investor: ООО «Петровские хлеба»
Number of workplaces: 45
Project time frame: 01/01/2021 - 01/01/2024
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 1 млрд рублей
Инвестор: Investor: ОП АО «БТК Групп»
Number of workplaces: 2500
Project time frame: 01/01/2023 - 01/01/2024
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 1,1 млрд рублей
Инвестор: Investor: ООО «Интэк»
Number of workplaces:
Project time frame: 01/01/2022 - 01/01/2024
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 1,4 млрд рублей
Инвестор: Investor: ООО «Метеор Термотехника Энгельс»
Number of workplaces: 191
Project time frame: 01/01/2013 - 01/01/2024
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 1,9 млрд рублей
Инвестор: Investor: АО «Металлургический завод Балаково»
Number of workplaces: 36
Project time frame: 01/01/2021 - 01/01/2024
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 2 млрд рублей
Инвестор: Investor: ООО «Грачевка»
Number of workplaces: 100
Project time frame: 01/01/2022 - 01/01/2024
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 4,8 млрд руб
Инвестор: Investor: АО «Апатит»
Number of workplaces: 28
Project time frame: 01/01/2020 - 01/01/2024
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 2,6 млрд рублей
Инвестор: Investor: АО «ЕПК Саратов»
Number of workplaces: 200
Project time frame: 01/01/2019 - 01/01/2025
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 2 млрд рублей
Инвестор: Investor: АО «Металлургический завод Балаково»
Number of workplaces: 68
Project time frame: 01/01/2021 - 01/01/2025
08/18/2025 11:00:00 pm More detailed
card-img

Investments: 2 млрд рублей
Инвестор: Investor: ООО «А-сервис»
Number of workplaces: 692
Project time frame: 01/01/2023 - 01/01/2025
08/18/2025 11:00:00 pm More detailed