Investment map

Need for Investment
Организация производства газового оборудования

Organization of gas equipment production

  • Place of implementation: Saratov.
  • Transaction form: search for a co-investor.
  • Form of ownership: private property.
  • Infrastructure: the site is equipped with engineering infrastructure.
  • The volume of investments: from 500 million rubles

Details
Строительство маслоэкстракционного завода мощностью 500 тонн/сутки семян подсолнечника

Construction of an oil extraction plant with a capacity of 500 tons/day of sunflower seeds

  • Place of implementation: G. Balashov.
  • Transaction form: search for a co-investor.
  • Form of ownership: private property.
  • Infrastructure: along the boundaries of the land plot.
  • The volume of investments: from 1.5 billion rubles

Details
Строительство завода по глубокой переработке зерна пшеницы для производства аминокислот

Construction of a plant for deep processing of wheat grain for the production of amino acids

  • Place of implementation: G. Balashov.
  • Transaction form: search for a co-investor.
  • Form of ownership: rent.
  • Infrastructure: the territory is provided with engineering communications.
  • The volume of investments: 20 billion rubles

Details
Площадки Столыпинского индустриального парка

Sites of the Stolypin Industrial Park

  • Place of implementation: Saratov, R.P. Sokolov.
  • Transaction form: sale of the lease right followed by the right of redemption.
  • Form of ownership: municipal property.
  • Square: 84.8 ha.
Details
Строительство завода по производству минеральных удобрений из природного газа

Construction of a plant for the production of mineral fertilizers from natural gas

  • Place of implementation: Krasnopartizansky district, Gorny settlement.
  • Initiator: LLC SEC Gorny.
  • Transaction form: search for a co-investor.
  • Form of ownership: municipal property.
  • Platform:164 ha.
  • Infrastructure: gas: 1 billion cubic meters/year, water: water intake 1800 cubic meters/hour, electricity: Stepnaya substation two transformers of 16 MW each.
  • The volume of investments: from 1.5 billion rubles.
Details
Организация производства  безалкогольной (алкогольной продукции)

Organization of production of non-alcoholic (alcoholic) products

  • Place of implementation: Saratov region, Baltai village.
  • Transaction form: sale.
  • Form of ownership: search for a new owner.
  • Platform: 12.03 ha
  • Infrastructure: the presence of its own electrical substation, an artesian well, sewage treatment plants, gas supply is provided.
  • The volume of investments: from 120 million rubles.
Details
Современный тепличный комплекс для выращивания овощных и ягодных культур

Modern greenhouse complex for growing vegetable and berry crops

  • Place of implementation: G. Marx.
  • Investment volume:from 1 billion rubles
  • Form of ownership: municipal property.
  • Transaction form: rent
  • Platform: 325.7 ha, Saratov region, Marx.
  • Infrastructure: the possibility of connecting to gas and electricity supply facilities (up to power lines – 0.03 km.) drilling of artesian wells.
Details
Сборка буровых установок и их монтаж для нефтегазовой промышленности

Assembly of drilling rigs and their installation for the oil and gas industry

  • Place of implementation: Saratov, Sokolovy river, Stolypin Industrial Park.
  • Transaction form: rent without bidding
    with the right of redemption.
  • Form of ownership: municipal property.
  • Infrastructure: gas supply – 15.6 mln m3/year, electricity – 25 MW, water supply - 3000 m3/hour, wastewater disposal – 2400 m3/day, wastewater disposal – 13000 m3/day.
  • The volume of investments: from 1.5 billion rubles..
Details
Производство полипропиленовых биг-бэгов

Production of polypropylene big bags

  • Place of implementation: Saratov, Sokolovy river, Stolypin Industrial Park.
  • Transaction form: rent without bidding with the right of redemption.
  • Form of ownership: municipal property.
  • Infrastructure:gas supply – 15.6 mln m3/year, electricity – 25 MW, water supply - 3000 m3/hour, wastewater disposal – 2400 m3/day, wastewater disposal – 13000 m3/day.
  • The volume of investments: from 800 million rubles.
Details
Завод по производству электрических приборов бытового назначения, телефонов и планшетов

Factory for the production of household electrical appliances, phones and tablets

  • Place of implementation: Saratov, Sokolovy river, Stolypin Industrial Park.
  • Transaction form: rent without bidding with the right to buy.
  • Form of ownership: municipal property.
  • Infrastructure: gas supply – 15.6 mln m3/year, electricity – 25 MW, water supply - 3000 m3/hour, wastewater disposal – 2400 m3/day, wastewater disposal – 13000 m3/day.
  • The volume of investments: from 2 billion rubles.
Details
Завод по производству светодиодных светильников

Factory for the production of LED lamps

  • Place of implementation: Saratov, Sokolovy river, Stolypin Industrial Park.
  • Transaction form: rent without bidding with the right of redemption.
  • Form of ownership: municipal property.
  • Infrastructure: gas supply – 15.6 mln m3/year, electricity – 25 MW, water supply - 3000 m3/hour, wastewater disposal – 2400 m3/day, wastewater disposal – 13000 m3/day.
  • The volume of investments: from 1 billion rubles.
Details
Сборка запчастей для сельскохозяйственной, дорожно-строительной, транспортной техники

Assembly of spare parts for agricultural, road construction, and transport equipment

  • Place of implementation: G. Saratov, Sokolovy river, Stolypin Industrial Park.
  • Transaction form: rent without bidding with the right to buy.
  • Form of ownership: municipal property.
  • Infrastructure: gas supply – 15.6 mln m3/year, electricity – 25 MW, water supply - 3000 m3/hour, wastewater disposal – 2400 m3/day, wastewater disposal – 13000 m3/day.
  • The volume of investments: from 1.5 billion rubles.
Details