Assembly of drilling rigs and their installation for the oil and gas industry
- Place of implementation: Saratov, Sokolovy river, Stolypin Industrial Park.
- Transaction form: rent without bidding
with the right of redemption. - Form of ownership: municipal property.
- Infrastructure: gas supply – 15.6 mln m3/year, electricity – 25 MW, water supply - 3000 m3/hour, wastewater disposal – 2400 m3/day, wastewater disposal – 13000 m3/day.
- The volume of investments: from 1.5 billion rubles..
Background:
- Increasing the share of physically and morally obsolete drilling equipment
- Production of new drilling equipment taking into account the constant complication of oil production conditions
Competitive advantages:
- Convenient location and well-developed logistics of the site for the transportation of finished products
- Tax preferences for residents of the industrial park